- What is a door schedule?
A door schedule is a document that lists all the doors required on a project, as well as their dimensions and other pertinent information. It’s used by contractors to order doors and ensure that they’re the correct size and fit properly in the opening.
In addition to basic dimensions, a door schedule might also include additional information such as fire rating, whether the door is hollow or solid, what kind of hinges are required, etc. It’s an important document for ensuring that all the doors on a project are ordered correctly and arrive on time.
- What should be included in a door schedule?
When choosing a door schedule, you will need to consider the size of the door (width, height, thickness), the material of the door, the composition of the door, and the colour and finish. You will also need to decide if you want a single or double door.
The most common materials used for doors are wood, steel, and aluminium. Wood is a popular choice because it is durable and can be stained or painted to match any décor. Steel is strong and resistant to corrosion, making it a good choice for coastal areas. Aluminium is lightweight and non-corroding, making it a good choice for high traffic areas.
When choosing a door schedule, there are a few factors you’ll need to take into account:
-The size of the door (width, height, thickness)
-The material of the door (wood, metal, glass)
-The composition of the door (solid or panel)
-The colour and finish of the door.
-Code number – This is the identification code for the door, which should be unique for each door in a facility.
-Name – The name of the person or department who is responsible for the door.
-Style – The style of the door, such as hinged, sliding, or swinging.
-Number required – The number of this particular type of door required for a facility.
You can also download an internal door schedule here - What s the purpose of a door schedule?
A door schedule is a way of presenting complex information about doors to be made for a contract. It includes the dimensions of each door, the type of wood or other material to be used, and other specifications pertinent to the job.
A door schedule is an important document in any construction project that involves doors. It allows everyone involved in the project – from the contractor who will make the doors, to the people who will install them – to understand exactly what is required of them. Skipping or botching this step can lead to problems down the line. So it’s crucial that everyone involved in a construction project with doors pays close attention to the door schedule.